Document control built for electrical contractors — cable schedules, terminations, megger and loop check results, all recorded against the circuit they belong to and compiled into a turnover package that survives review.
Electrical turnover fails on the same things every time: a megger reading with no acceptance criterion written beside it, a torque value with no calibrated wrench behind it, a loop signed off at zero and span but never checked in between, and a cable schedule that stopped matching the field somewhere around the second revision. None of that is caught by better filing. It is caught by recording the test and the thing that makes the test mean something in the same place, at the same time. That is the whole design here — built for the small and mid-size electrical contractor who has to hand over a defensible package, not retrofitted from generic project management software.
Every cable, termination, and test recorded against the circuit it belongs to — so traceability is a query, not an afternoon of digging.
From, to, type, size, voltage class and routing — the spine every other record on the job keys off, worked down from scheduled to pulled to terminated to tested.
Every landing with its lug, the torque applied against the value specified, and the calibrated wrench that produced it. A loose termination is the most common failure in service.
Megger readings per phase combination, not averaged into one figure that hides a bad leg — with test voltage, temperature correction, DAR and PI, and the acceptance criterion recorded beside the reading.
Injected and observed at 0, 50 and 100 percent against the DCS or PLC. A loop can be right at zero and span and still be non-linear in between — which is exactly what a single-point check misses.
Settings, injection results and measured trip time, recorded as-found as well as as-left — because as-found is the evidence for what the plant was actually protected by.
Grid, rods, risers and bonds with connection type and whether it was inspected before backfill, plus fall-of-potential and clamp-on resistance results against the criterion.
Licences, NFPA 70E and qualified-person status alongside test instrument calibration — an out-of-cal megger invalidates every reading it produced, so the audit treats it as blocking.
Root cause and corrective action documented per NCR, through to closure, each printing as its own summary sheet.
Everything logged during the job compiles into the handover package — no re-typing, no chasing paperwork the week it is due.
One click compiles every section into a cover-paged, indexed document on true letter pages — print to PDF, or export with attachments merged in.
Multi-page PDF redlining on one-lines, schematics and panel layouts, with a cable-number callout tool — draggable and colour-coded.
Panelboards, switchgear and MCCs with ratings, feed source and arc flash labelling — each carrying its own breaker-by-breaker schedule rather than a separate list to keep in step.
Search every record in a project — including the filenames of attached documents. The fastest way to find one megger report out of hundreds.
Every table exports to Excel-ready CSV, and a timestamped snapshot downloads every record in a project as a copy you own outright.
Read a scanned test report, calibration certificate or 70E card and the fields fill in for you to check — you confirm every value before it saves. It never judges whether a document passes.
Expiring qualifications, instruments out of calibration, open non-conformances and missing test reports surface while there is still time to fix them.
Every gap that would fail a turnover review — expired qualifications, instruments out of calibration, open NCRs, unanswered RFIs, test records missing their report — with a printable report.
Specifications, installation and test procedures tracked by revision, type and status — each carrying the governing code the work is judged against.
811 tickets for duct bank and ground grid work, plus energized-work and LOTO permits, with expiry tracking and an expiring-soon banner.
Per-person rights to create and delete, with read-only auditor seats for clients and third-party inspectors — free, however many you invite.
Subcontractor contracts and insurance certificates held against the project they worked on.
Items categorised by what blocks energization, what blocks turnover and what can follow — closed out with an automatic sign-off stamp, with RFIs tracked to a response.
Real feedback from real users — every submission is reviewed before it goes live.
Every plan includes every feature. No tab is locked behind a tier — a one-person shop gets the same document control as a company with forty electricians.
AI document reading is billed separately as prepaid credits — $25 for 100 document reads, so you only pay for what you use. Everything else is included.
Some of it is inside the app already, some of it is being written. Nothing here is gated behind a sales call, and nothing is listed before it exists.
The full feature map, step-by-step walkthroughs for recording a megger test, proving a loop end to end, redlining a drawing and compiling a job book, plus a troubleshooting section. Generated from the app itself, so it cannot drift out of date. Printable to PDF.
Read the guide →Ten sheets — megger test report, continuity test, loop check, ground resistance, termination and torque log, torque record, NCR, RFI, punch list and JSA. Free and ungated, printable as they are or stamped with your own company header from inside the app.
Get the forms →Every section of a complete electrical turnover package walked through on a worked example, and the cross-checks that get a package sent back — an instrument out of calibration, a test with no acceptance criterion, a loop signed off at two points.
In preparationWhich records each standard actually produces — NFPA 70, NFPA 70E, NETA ATS and MTS — how they reference each other, and what a reviewer checks. Summaries of what a standard requires you to record, never its text.
In preparationPractical write-ups: why an uncorrected megger reading fails a good cable in August, what a client audit actually looks at, and the inconsistencies that cost contractors a turnover sign-off.
In preparationWhat changed and when — so you can see whether this is still being worked on before you depend on it.
In preparationThe blank form pack is ready now — megger test report, continuity test, loop check, ground resistance, termination and torque log, torque record, NCR, RFI, punch list and JSA, free and ungated. Leave an address and we’ll tell you when the spec quick reference and field notes follow.
No newsletter, no drip sequence, and we don’t sell or share your address. Unsubscribe in one click.
No. Sparky QC runs in a browser — desktop, tablet, or phone. There is nothing to install, no IT ticket, and no server to maintain.
Yes. The installation tabs — cable schedule, cable pulls, terminations, conduit, tray, grounding and telecom — take a CSV straight off the engineer’s spreadsheet, and every tab has a Download template so you can see the columns first. Save as CSV from Excel; column order does not matter, unrecognised columns are ignored, and nothing is written until you have seen exactly what will be created. Drawings, certificates and reports upload as PDFs or photos, and AI pre-fill can read a scanned certificate and fill the form for you to check.
No. Sparky QC covers power distribution, controls, instrumentation and commissioning scopes. Use the tabs your job needs and ignore the rest — empty sections are simply left out of the job book.
Only you and the people you invite. Access is enforced by the database itself, not by hiding buttons — a user with no relationship to a project cannot read or write to it even through the API.
Yes, at any time and without asking us. Every table exports to CSV, and Save Snapshot downloads every record in a project as a single timestamped file you own outright, independent of the app or your account.
Worth taking one at project milestones regardless.
Your records remain available for a retention period after cancellation so you can export anything you need, and Save Snapshot works right up to the end. Take a snapshot before you cancel and you keep a complete copy whatever happens.
No. AI is only involved when you explicitly choose Read from document, and then only to fill that one form. Your records are not used to train anything.
No, and be wary of anything that claims otherwise. Sparky QC organises, tracks, and compiles your records so nothing goes missing and gaps surface early. Whether the work meets code is determined by your procedures, your inspectors, and the governing specification — not by software.
It reads them and fills in the form; it does not verify or approve anything. You confirm every value before it saves. We deliberately do not have software assert that a certificate is valid — that judgement belongs to a qualified person, and a QA/QC record is a legal document.
Yes. Invite them as an auditor and they can read and export everything but change nothing — enforced in the database. Auditor seats are free, however many you invite.
Yes. Records can be entered and photos attached from a tablet or phone in the field, which is where most test results are actually written down.
Sparky QC needs a connection to save records. On a site with no coverage, take photos and write readings down as normal, and enter them when you are back in range — nothing is lost, but nothing saves offline eithef — and upload when you are back in range.
Anyone who has accepted an invitation to your company account. Pending invitations are never charged, and read-only auditor seats are always free.
Remove them and the seat is credited back, prorated. Adding someone mid-month is charged the same way.
Yes, from Billing in the app. Cancellation takes effect at the end of the period you have already paid for — you keep full access until then and are not charged again.
Full terms are in our refund and cancellation policy.
Never. Payment pages are hosted by Stripe; nothing sensitive touches Sparky QC.
The software most contractors are offered is either a spreadsheet with ambitions or an enterprise platform priced for a general contractor. Sparky QC is built for the small and mid-size electrical contractor in between — the people who have to produce the same defensible documentation with a fraction of the overhead.
Every feature here exists because it was needed on a job, not because it demoed well. The blank forms are the ones crews already fill in by hand. The job book prints as a binder — cover, spine labels, tabbed dividers, index — because that is how a turnover package is actually handed over.
What it will not do is decide anything for you. It reads a document; it does not approve one. It records a classification; it does not pick one. Whether a certificate is acceptable, or a non-conformance is major, stays your call and stays on your record.
Questions about whether Sparky QC fits your scope, a walkthrough for your crew, or enterprise terms — get in touch and you will speak to the people who build it, not a sales desk.
Sparky QC — Texas, USA. Company registration in progress; full business details will be published here once filed.
Log in to access your projects.
Every plan includes full access to every project and every tab — no feature gating.